Day 3 of Smoothing Off the Ground Ready for Floor Slab

 Today, working in damp softened soil, we carried on with the scraping of the soil inside the footprint of the house. We finished off Bedroom 3 and the front half of the Hall way, plus removed a huge amount of soil from Bedroom 2 too!

Ground Smoothing Day 3-2

Ground Smoothing Day 3-2

Ground Smoothing Day 3-3

Ground Smoothing Day 3-3

Ground Smoothing Day 3-1

Ground Smoothing Day 3-1


On Monday, we will carry on scraping backwards towards Bedroom 3 (from the Entertainment room) and through to the back Perimeter wall, and continuing to the Kitchen and Bedroom 1 areas.