This morning, we got on with clearing the sandy soil material away from the base of the Perimeter Wall around the house so we can collect and transport the Rainwater coming off the roof, using 100mm pipework and sent to our filtration unit at the end of the Swimming Lane.
There will be a complete circuit around the whole house, with seven downpipes from the guttering, each of these downpipes are located in each of the “inside” corners, like the front extension, the Conservatory, and the back extensions.
We managed to do about half the circuit so far in this shortened session this morning.