This week, we started on building our timber Stud Wall that surrounds the concrete shell that encloses the Entertainment Room. But before that, we created another piece of equipment down in our Great Room area, to help us chop up the various timber planks into precise lengths required for each wall around the house (see Chop Saw Plank Slicing Station).
We marked out on the footplate the spacing for all the stud posts for each section of the wall, requiring a 400mm separation of the posts for the 89mm wide walls (the left and right sides of the room joining the Utility Room and hall leading from the front door) and a 600mm spacing for the end wall opposite the window. We duplicated these marks on another set of horizontal planks we made, ready for the top plate that goes on top of the stud posts.
We then chopped up twenty-one 89mm CLS and eleven 63mm CLS planks measuring 2638mm long, then two 2600mm long pieces, both being the 89mm CLS width and finally, an one off 2804 length of 63mm CLS.
We proceeded to nail each post into place using 90mm ring-shank nails and put on the top plate planks on too. We also glued two of the 63mm posts to the steel leg (holding up the Skylight and roof).
The last job of the week was to nail up sheets of the fermacell boards on the inside surface of the stud walls to improve the sound deadening potential of the whole Entertainment Room. We placed each sheet horizontally, over two and bit rows and applied to all the edges with PU construction glue to ensure a continuous uniform and solid barrier.
We are now ready for the concrete blocks and beams which will hopefully will be delivered Monday and Tuesday, just before the lock down is enforced. That will keep us busy for a few weeks.