New Tool to Split apart the Aquacell Crates
This afternoon, while we waited for the black metal paint to dry on the wheel hub, we made a new tool to help us take apart the plastic holey crates,…
A DIY Selfbuild by Stephen, Shaun & Daphne
This afternoon, while we waited for the black metal paint to dry on the wheel hub, we made a new tool to help us take apart the plastic holey crates,…
This morning, on this lovely Sunday morning, we did some maintenance tasks, like for example, repair the puncture we got in one of the tyres of the large flatbed trolley.…
As part of our commitment, with our neighbours, to keep the Loke neat and tidy, we scooped up the remaining hardcore and ballast gravel and sharp sand mixture and moved…
After we have finished the sewage pipes (the filling in of their trenches), we started with the adjustment to the Earth Tube Mixing Chamber and the Air Supply Tunnel construction.…
Today, again with marvellous weather, we finished filling in the trenches that has the sewage pipelines in. The trench cutting across the driveway and footpath was carefully layered with regular…
This afternoon, we started putting all the dirt and soil back into all the trenches of our three sewage pipe runs. We began at the trench cutting across our driveway,…
This morning, we mixed up 3 bags of cement and 18 buckets of ballast and poured the lot into the open area we had all stuttered and ready. This slab…
Today, while we waited for the building control inspector to visit us, we got on with making adjustments to the Earth Tube Mixing Chamber. We had originally constructed it several…
This afternoon, our building control inspector, Ken, came along and look at our sewage lines. He went around asking questions about what that line is for and what this sewage…
And this afternoon, while we were waiting for the building inspector to come to look at our sewage pipes, we rebuilt the boundary fence, between us and the workshop. We…