Garden Room Shelving
The 27 pieces of shelving for the Garden Room was finished being sanded smooth this morning. All were vacuumed to remove all the dust and first half painted before lunch.…
A DIY Selfbuild by Stephen, Shaun & Daphne
The 27 pieces of shelving for the Garden Room was finished being sanded smooth this morning. All were vacuumed to remove all the dust and first half painted before lunch.…
The second coat of Oil White paint was applied to the various surfaces that were painted the day before. The shower cubicle is now a gloss white along with the…
The Smoke and Fire detectors have been wired up and connected into the lighting circuit. All are linked together and seems to be in working order with the pressing of…
All the bare wooden surfaces were painted white. The air ducting, the shower cubicle, the covers over the hot tank and air con unit and the shelves under the sink…
This morning we put back the sliding doors for the toilet in the Garden Room. They were given a clear coat of varnish a little while ago. We changed the…
We calculated what shelves we needed in the Garden Room to provide storage space while the room is being used as the kitchen. It turns out to be two 300mm…
The compartments where the hot water tank, air ducting and chimney, and fan lies, are now all covered up! They just need a coat of paint!
We analysed our building layout including our temporary living quarters and selected 4 devices, 1 optical smoke detector, 2 ionising smoke detectors and 1 heat sensor, all linked together as…
The sink seems to be sealed! We ran water into the sink and nothing leaked!! The waste disposal unit operated just fine too! Phew! Thanks goodness for that! We switched…
We put together a light box with two low energy bulbs in it, to provide plenty of light inside the shower! It was made of spare pieces of our fermacell…