Installed the rainwater soakaway this afternoon. We carefully leveled the area in the corner of the trench and then placed geo-textile down. Then installed 18 Aquacell modules in a 3m x 3m array, the modules were clipped together. A hole was made in to top to allow connection from the rainwater system. Finally the geo-texile was wrapped around all 6 sides.