In a very misty like sprinkle of rain, we started the new week by continuing with the erection of the External Wall, doing wall “M”, wall “N” and wall “O”, all these sections going along the back of the house, that is 17 Legs all glued and nailed.
It is the same old procedures of adjusting the height of each Leg, then gluing and nailing them into place and finally the top-plate positioned and nailed into place on top.
We then got half way along wall “P”, this being the longest stretch of wall on the left side of the house and the Great Room, having adjusted 8 Legs out of the 16 needed to be done.
Tomorrow, we will finish wall “P” and continue around onto wall “A” going along the front of the house.
P.S. Here is a diagram of the Walls with labels.