Workshop Cleared of Plywood Strips and Confirmation of Calculations Continues
This morning, we tidied up the workshop by moving the huge piles of plywood webbing strips we generated a couple of days ago. They all (apart from 32 pieces) were…
A DIY Selfbuild by Stephen, Shaun & Daphne
This morning, we tidied up the workshop by moving the huge piles of plywood webbing strips we generated a couple of days ago. They all (apart from 32 pieces) were…
Today, we finished off chopping the correct required angled cuts on the end of the pile of 89mm CLS timber pieces we got made from yesterday. The chop saw did…
Over the last three days, we have been measuring, calculating, sorting, adjusting, calibrating and humping all sorts of stuff that are all aimed towards the next stage of creating the…
This afternoon, after lunch, we quickly set up a new stack of all the 89mm CLS timber planks, to spread out every single length so that plenty of air could…
Today was the day when we grabbed the three rafters that we created yesterday and the day before, and took them outside to get them up and installed! We only…
Today, following from yesterday’s job of preparing for NO and OP rafters, we sanded and vacuumed these two rafters so it all came together and got glued and nailed tight…
Today, in lovely sunshine, we started to get the final set of special LVL rafters created. We first went outside to install the three corner legs for MN, NO and…
And in the afternoon, we finished off slicing all the remaining polystyrene sheets into 250mm wide by 38mm thick strips. The 14 boards were sliced (using our hot-melt wire machine)…
This morning, we finally managed to get out there and get the big heavy O Ridge rafter installed!! We checked to how dry the rafter was and brushed off the…
We spent the day inside our workshop to avoid more rain. It has been quite wet these last few days and we are having to do other work while we…