Platform for Scaffolding Tower
Yesterday, We constructed the 1st platform for our scaffolding tower units, using 18mm OSB boards, made into 3 sections to straddle across the top of the scaffold sides, using 89mm…
A DIY Selfbuild by Stephen, Shaun & Daphne
Yesterday, We constructed the 1st platform for our scaffolding tower units, using 18mm OSB boards, made into 3 sections to straddle across the top of the scaffold sides, using 89mm…
This afternoon, more holes were drilled into the I beams, this time, the webbing received dozens of 5mm holes for wood screws to hold more timber in place. The I…
This morning, we wired up a 4 way socket strip inside the Electric Box with a RCD unit inline, but only after we had to change the supply mains cable…
The task continues to prepare all the steel pieces ready for assembly. Today, the big I beams sitting outside, got dozens and dozens of small 5mm holes put into the…
The wooden box was painted with the bitumen rubber solution yesterday to provide a good rainwater protection, and today, it was installed outside beside the huddle of conduits in where…
This afternoon, we constructed a wooden box to provide electrical sockets and a place to store a reel of cable, all inside a rain proof cabinet. This cabinet will be…
This morning, whilst it rained, we made an automatic pump to extract and remove the rainwater from inside our house footprint. The concrete is open to the sky so we are…
This afternoon, the task of drilling all the bigger holes (13mm in diameter) continued and was finished today, using the hired “mag drill” machine with its core drill bit. The…
Yesterday and this morning, we buried a conduit around the building site, from the garage at the bottom of the camera pole, all the way to the top of the…
Finishing in the dark this evening, we had drilled dozens of 13mm holes in the I beam pieces standing outside on timber planks! We had to turn over the…