Analysing, Designing and Implementing a Core Set of Procedures and Services
This last month has been us concentrating on analysing what we are going to have in the way of a network, joining up all our microcontrollers and how they will…
A DIY Selfbuild by Stephen, Shaun & Daphne
This last month has been us concentrating on analysing what we are going to have in the way of a network, joining up all our microcontrollers and how they will…
This is a long awaited blog report to catch up on what we have been doing these last few months since before Christmas last year. We had to come up…
We were interrupted in doing this task by a bout of Covid and waiting for the weather, but we finally got to install an extra layer of insulation foam boards…
Sorry to say but we have to struck down by the Covid virus!! We think it arrived from when we visited the hospital, which then got passed on to the…
We started the new week by tackling the next phase of installing our green solar capture schemes, this time, the third string of panels, basically almost square shaped ones, measuring…
For this week, since we have built the two battery 50Volt drawers, we decided to get on with installing the second string of Solar Panels, up on the P section…
We decided to allow our 50Volt battery packs to run more empty by changing the lower threshold point that they are allowed to discharge down to before cutting off and…
Our third drawer, the smaller one, had the remaining four battery cells installed and wired up. We swopped out the isolating switch for a heavier duty model, capable of handling…
We spent the last week or so, constructing a cabinet to hold all our Lithium Iron Sulphate cells, grouped into battery packs. We went for a drawer design so we…
We have been hunting around for a suitable Solar Panels to fit up inside our Skylight for the last couple of months and finally have discovered a particular source that…