Did preparation work for installing the rainwater tank. Started by marking out and leveling the sand for the base of the tank, we spent so time getting the right as we don’t want the tank to be off level!

flate base in the sand

Then we humped the 87 aquacell modules down into the hole from their delivered location next to the house.

big pile of blue crates

By Stephen

Leave a Reply