Well early for us! About 8:30 we started to prepare formwork infront of the temporary front door. This will give us a place to put any excess concrete later on. We also used the hose to wet down the sand in the bottom of the trenches so as to reduce suction of water from the concrete.

Concrete Overflow area

Wet sand in the trenches

By Stephen

Leave a Reply