This afternoon, we finished off the tidy up operation around the base of the External Wall, clearing the last small section of the concrete floor of leaves, dirt and rubble.

We also went around the outside of the perimeter wall, collecting up lumps of mortar that dibbled down and landed on the sandy soil.

So in the end, the total amount of “stuff” was about 5 bags worth!!

By Shaun

Leave a Reply