Ridge Bar Complete and First Four Triangular Glazing Panes Cut
We finished off the installation of the Ridge bar this morning. The last section, the fourth one, was 4.494 metres long and we now have a complete ridge clamping down…
A DIY Selfbuild by Stephen, Shaun & Daphne
We finished off the installation of the Ridge bar this morning. The last section, the fourth one, was 4.494 metres long and we now have a complete ridge clamping down…
This morning we continued with the job of installing the glazing panes along the back of the Skylight and we now have 25 out of the total of 33 “windows”…
On this glorious sunny day, we started the job of taking up the glazing panes up to our Skylight! But we had to finish off a single special job of…
This morning, we finished off the task of fixing the End Caps to the set of rafter bars we are preparing for the first batch, mainly for the whole of…
This morning, we finished off the creation of the End Caps for all of the 33 rafters of the Skylight. They had a pilot hole drilled into the sticking out…
We finished off the installation of the rubber gasket strips on all the rafters and also the complete circuit of the outer rim of the skylight. Then in the workshop,…
This morning, we created a further set of glazing bars for clamping down the fourth edge along the bottom of each window in the Skylight. It is a 20mm wide…
Today (and a bit from yesterday), we resumed the assembly of our Skylight framework, working along the front, then along the back side, both towards the right hand end and…
Today, this afternoon, we resumed the job of assembling the bits and pieces to build our Skylight module. We went around the left end of the skylight and along the…
Yesterday morning and this morning, we continued with the calculations for the Slates and all the accessories to cover our roof. A 18 page spreadsheet was used to quantify the…