After finishing the preparation work this morning, like filling up the glue dispenser bottle, cutting some more straight noggings as well as eight little “filler” noggings too, then collecting 14 polystyrene foam strips and finally sweeping the whole workshop, we were ready to start assembling the nine rafters in nine separate sessions.
And amazingly enough, we managed to do all nine rafters in one day! We are definitely speeding up our technique and procedures and now can turn around a long rafter in about 30 minutes on average – wow!
Tomorrow, we will look at our Bevel Slicing Machine and repair that. Also look to see where the leak in our garden shed roof is plus improve the coverings on our various timber storage stacks too. Then, we will Bevel cut the two remaining rafters and dress the nine rafters we did today to tidy them up and leave them all ready for Saturday to be installed outside.