Dolly’s Created to help transport our Slates
After having a major tidy-up in the workshop (to clear away the tools and mess from building our filtration module), we started on making various pieces of equipment to help…
A DIY Selfbuild by Stephen, Shaun & Daphne
After having a major tidy-up in the workshop (to clear away the tools and mess from building our filtration module), we started on making various pieces of equipment to help…
We finished off connecting the last large drain pipe to the Filtration Module, this being the final last resort overflow connection to the soak-away unit. Then the next job was…
Today, the job was to connect the three rainwater inlet pipelines (from our two roofs) and the output pipe to the Filtration module. But first, a leak test was performed.…
Today, we took the opportunity of a very nice sunny day and that the hole was reasonably dry, to tackle the job of installing and burying our new Rainwater Filtration…
This report is a summary of our week’s worth of work we did on our rainwater Filtration Module. Most of the time was spent on creating the two filter units…
Today, we continued with the task of building our two water filters. The long flat one’s frame is now constructed with a heavy thick metal bar around the perimeter and…
We constructed a small test rig, to reflect the design and placement of the two layers of the wooden battens to be on our roof and then played with a…
This is a combined report showing our progress of creating our rain water filtration module. It has been a very fiddly work, constrained by the slow “drying” time of the…
Sometime during the afternoon, we had the delivery of the remaining four pallets of our slates and they were unloaded alongside our Loke, following the line as we intended, but…
This morning, under the bright hot sun, we went on the roof of our Store Room to locate the leaks we had yesterday during a day of heavy rain. We…